How to write a quote for a job: what to include, with a worked example
To write a quote for a job, describe the work in plain words, price labour and materials as separate lines, say what isn't included, and give a total, a valid-until date and one clear way to accept. Here's the full checklist and a worked example you can copy.
How to write a quote for a job comes down to one test: could the customer read it once, understand exactly what they're paying for, and say yes without ringing you? A good quote (or estimate) names the customer and site, lists the work in plain words, prices labour and materials on separate lines, states what's excluded, and ends with a total, an expiry date and a simple way to accept.
This guide covers what to put on the page, the difference between a quote and an estimate, how to price the job so it still makes money, and a full worked example for a bathroom re-tile. Once it's sent, the next two jobs are following up on the quote and working out why some quotes are lost.
What should a quote for a job include?
Every quote for a job needs twelve things, and many lost or disputed jobs can be traced to one of them being missing. Use this as a checklist before you press send.
- Your business details: name, logo, phone, email, licence or registration number if your trade has one, and your tax number.
- The customer's name, the site address (if different from the billing address) and the person to contact on the day.
- A quote number and the date it was issued, so you can both refer to it later.
- A short summary of the job in one sentence, in the words the customer used: "Re-tile the main bathroom floor and shower walls."
- The scope: what you will do, in the order you will do it, in plain words.
- Line items: labour and materials priced separately, with quantities where they matter.
- Exclusions and assumptions: what is not included and what you have assumed, such as "existing floor is sound and level".
- The subtotal, tax (GST/VAT/sales tax) shown as its own line, and the total.
- Payment terms: deposit, any progress payments and when the final payment is due.
- Timing: when you can start and roughly how long the work takes.
- How variations are handled: extra work is quoted and agreed in writing before it is done.
- A valid-until date and one clear way to accept, such as an accept button or "reply to this email to book".
You don't need a legal document for a small job. But the exclusions, the variations line and the expiry date are the three items that save you the most arguments, and they're also the three most often left off.
Quote or estimate: which should you send?
Send a quote when you know the scope well enough to commit to a price, and an estimate when you don't. A quote is a fixed price for defined work. An estimate is your best guess, and it should say clearly that the final cost may change and why.
| Quote | Estimate | |
|---|---|---|
| Price | Fixed for the scope described | Approximate, may be a range |
| Use it when | You have seen the site and the scope is clear | Hidden work is likely, or the customer wants a ballpark first |
| What changes the price | Only agreed variations | What you find once work starts |
| Expiry date | Yes, usually 14 to 30 days | Yes, prices for materials still move |
| Customer expectation | This is what I will pay | This is roughly what I will pay |
Many trades use the two words loosely, and customers often ask for a quote when they really want an estimate. What matters is that your document says which one it is. If you're pricing work behind a wall or under a floor, write "estimate" at the top and explain what could move the price, or quote the known work and list the unknowns as exclusions to be priced later. Rules on how binding a quote is differ between countries, so check your local consumer and contract rules if you're unsure.
How to write a quote for a job, step by step
- Measure and photograph on site, and write notes before you leave the driveway: sizes, access, what the customer said mattered to them, and anything that looked wrong.
- List every task in the order you will do it. This list becomes your scope and your labour estimate.
- Put hours against each task, then multiply by your hourly rate.
- List materials with quantities, using your current buy prices plus your markup.
- Add the extras people forget: waste removal, travel, parking, equipment hire, permits.
- Write exclusions and assumptions for anything you have not priced.
- Set payment terms, timing and a valid-until date.
- Read it once as the customer would, then send it the same day or the next morning.
Write the scope in the customer’s words
The scope is the part customers actually read. "Supply and install 1 x 3.6 kW split system" means something to you. "Install a new air conditioner in the main bedroom, on the outside wall facing the garden, with the pipes run through the roof space" means something to them. Use both: the plain sentence first, the product detail underneath.
Separate labour and materials
Showing labour and materials as separate lines makes the price easier to trust, because the customer can see where the money goes. It also protects you: if they want to supply their own tiles, you can take that line out without re-working the whole price. You don't need to show your hourly rate if you'd rather not, but show the labour as its own line for each stage.
Say what is not included
Exclusions are where many disputes start. If you haven't priced painting after the plasterer, patching the ceiling, moving furniture or disposing of the old unit, say so in a short list. A customer who reads "excludes repairs to subfloor if found damaged; this will be quoted separately before work continues" is far less likely to argue when it happens.
Make accepting easy
Every extra step between "yes" and "booked" loses some customers. If they have to print, sign, scan and email it back, some won't. An accept button, or a single line saying "reply 'yes' to this email and we'll call to book a start date", removes that friction.
A worked example: quoting a bathroom re-tile
Say you're quoting to re-tile a small bathroom floor and the shower walls. You've measured 24 m² (about 258 sq ft) of tiling, allowed 38 hours of labour at $85 an hour, and marked up materials by 20%. These figures are an example, not a price guide. Here's how the lines come out.
| Line | Detail | Price |
|---|---|---|
| Strip out | Remove existing wall and floor tiles, bag waste. 8 hours | $680 |
| Waterproofing labour | Shower recess and floor. 4 hours | $340 |
| Waterproofing materials | Membrane, primer and bond-breaker | $200 |
| Tiling labour | Floor and shower walls, 24 m². 26 hours | $2,210 |
| Tiles | Customer’s chosen tile, 24 m² plus 10% for cuts | $1,080 |
| Fixing materials | Adhesive, grout, trims and silicone | $310 |
| Waste removal | Bin hire and disposal | $350 |
| Subtotal | $5,170 | |
| Tax | At the rate that applies where you work | Added |
Underneath the lines, the rest of the quote reads like this. Copy the layout and change the details to suit your trade.
Scope: Remove the existing floor and shower wall tiles, waterproof the shower and floor, and tile with your chosen tile. Includes all trims, grout and silicone, and taking the waste away. Excludes: plumbing changes, replacing the vanity, painting, and repairs to the floor or wall framing if found damaged (we will show you and quote before continuing). Timing: we can start the week of 7 December; the work takes about five working days. Payment: 10% deposit to book, balance on completion within 7 days. Changes: any extra work is quoted and agreed in writing first. Valid until: 11 December. To accept, click Accept below or reply to this email.
Notice what this does. (One check first: some places cap deposits by law. NSW, for example, limits deposits on home building work to 10%, so the example uses 10%.) The customer can see that more than 60% of the price is labour, can see the tiles are a separate line if they want to supply their own, and knows up front what happens if you find rot under the floor. That's what makes a $5,170 quote feel safe to accept.
How do you price a job so the quote still makes money?
Price a job by adding up your true hourly cost of labour, your materials at cost plus a markup, and every extra the job needs, then checking the total leaves the margin you want. Most quotes that lose money weren't priced too low on purpose; something was left out.
- Labour: use a rate that covers wages, retirement or pension contributions, insurance, the van and the hours nobody pays for, such as quoting and driving. If you don't know that number, work it out once and reuse it.
- Materials: price from current supplier costs, not last year’s, and add your markup. Allow for waste and cuts.
- Time: estimate hours per task, then compare against what similar jobs really took. If jobs keep running over, your estimates are the problem, not the crew.
- Extras: waste, travel, parking, access equipment, permits and certificates.
- Margin: check what is left after costs as a percentage of the price, not of the cost.
That last point catches a lot of people. A 20% markup on materials is not a 20% margin: $900 of tiles marked up 20% sells for $1,080, which is a margin of about 16.7%. The full explanation, with a table of markups and the margins they produce, is in markup vs margin for trades.
Common quoting mistakes that lose jobs or margin
- Sending it days later. The customer has usually asked more than one business, and the first clear quote sets the standard the others are judged against.
- One lump sum with no breakdown. A single figure invites the customer to compare on price alone.
- Vague scope. "Bathroom tiling as discussed" means something different to each side by the time the job is finished.
- No exclusions. Anything not mentioned is assumed to be included.
- No expiry date. A quote accepted eight months later at last year’s material prices can wipe out the margin.
- Prices copied from memory. If your supplier's prices went up, your quote didn't.
- No next step. If the quote doesn’t say how to accept, many customers just wait for you to call.
What happens after you send the quote?
After you send the quote, the job is won or lost on follow-up. Many customers who don't reply haven't decided against you; they're busy, comparing, or waiting on a partner. A short check-in two business days later, a second about a week after that, and a final note before it expires will win jobs that would otherwise go quiet. The schedule and the exact wording are in how to follow up on a quote.
When a quote is declined, write down why. After a few months, those reasons tell you whether you're losing on price, speed, scope or trust, which is covered in why you're losing quotes.
Doing it without the evening admin
Writing quotes by hand in a word processor works, but every quote means re-typing prices, and every accepted quote means re-typing the same lines into a job and later an invoice. Quoting software built for trades removes most of that by pricing from a saved catalogue and carrying the lines through to the job.
Wondering how the costs stack up for a whole team? See per-user vs flat pricing for job management software.
Questions
How long should a quote be valid for?
Most trades use 14 to 30 days. Shorter suits jobs where material prices move quickly; longer suits customers who need time to arrange finance or approvals. Whatever you choose, print the date on the quote, not just the number of days.
Should I show my hourly rate on a quote?
You don't have to. Showing labour as its own line for each stage is enough for most customers to trust the price. Showing hours and a rate can help on larger jobs, where customers like to see how the labour figure was built.
Should I charge for writing a quote?
For routine jobs, most businesses quote for free and build the cost of quoting into their rates. For large or design-heavy work, some charge a fee and credit it against the job if the customer goes ahead. Say so before you visit, not after.
What is the difference between a quote and an estimate?
A quote is a fixed price for clearly defined work. An estimate is an approximate price that may change once work starts. Write which one it is at the top of the document so the customer knows what to expect.